
Licensed, insured, code-correct bathroom remodeling across Irvine
Bathroom Remodel Contractors Near Me Irvine CA
If you've been searching for Bathroom Remodel Contractors Near Me Irvine CA, you already know the problem: half the bids are vague, the timelines slip, and nobody wants to talk about waterproofing. We're PeakStruct Group, a licensed local bathroom remodeler Irvine California homeowners call when they want a straight scope, a real schedule, and tile that stays put. We handle permits, demo, plumbing rough-in, tile, and finish work under one contract.
What's included
What's Included in a Bathroom Remodel
Our standard scope covers demo through final inspection. Tile, fixtures, and vanity are selected by you and priced into the contract. Structural repairs and unexpected water damage get priced as a change order before we do the work, so there are no surprise invoices at the end.
Demo and haul-away
Tear-out of tile, tub or shower, vanity, toilet, and drywall to the studs where needed. Debris hauled off-site daily so your house isn't a dumpster for a month. We protect the path from the front door to the bathroom with floor runners.
Plumbing and electrical rough-in
Relocating the drain, moving supply lines, adding GFCI outlets, installing a properly sized exhaust fan vented to the exterior. All permitted and inspected before the walls close. This is where most budget bathrooms cut corners and where most failures start.
Waterproofing and tile
Cement board, waterproofing membrane, 24-hour flood test, then floor and wall tile set with a laser level and grouted with a sealed grout. Niche, bench, and curb built during framing. We use a tile cutter and wet saw, not a score-and-snap on porcelain.
Vanity, toilet, and fixtures
Vanity set and secured to blocking, countertop and sink installed, toilet set with a new wax ring and supply line, shower valve and trim installed and tested. Brands like Kohler and Moen are common selections and we'll install what you pick.
Paint, trim, and final inspection
Sherwin-Williams paint on walls and ceiling, trim and baseboard installed, caulk lines clean, and the city inspector walks the job. You get the signed-off permit card and a 1-year workmanship warranty in writing before we pack up.
Service overview
What Bathroom Remodel Contractors Near Me Irvine CA Actually Do
Bathroom Remodel Contractors Near Me Irvine CA is a licensed general contracting service that tears out and rebuilds bathrooms to current California Building Code, handling demolition, framing, plumbing rough-in, electrical, waterproofing, tile, and finish carpentry under one contract. A full gut remodel of a standard 5x8 Irvine hall bath runs 3 to 5 weeks on site. We pull the permit, coordinate the trades, and keep the same crew on your job from demo day to final inspection.
Most Irvine bathrooms we open up are 20 to 35 years old, and the failure is almost always behind the tile, not on it. We routinely find water damage at the shower pan, mold growth in the wall cavity behind the cement board, and original galvanized or polybutylene supply lines that are one pressure spike from a leak. If you need a bathroom remodeler close to me Irvine CA who will show you photos of what's behind the drywall before quoting the fix, that's how we work.
The service timeline
How Our Bathroom Remodel Process Runs
The process flexes to the condition, but these checkpoints keep decisions clear.
On-site walkthrough
We measure the room, check water pressure and shutoffs, look at the subfloor and framing, and photograph the existing plumbing. You get a written scope with line-item pricing, not a lump sum. This takes about 60 to 90 minutes and costs nothing.
Permits and selections
We file the permit with the city and give you a selections sheet: tile, grout, vanity, fixtures, paint color. You pick from brands like Kohler and Moen at Home Depot or Lowe's, or through our supplier. Locking selections before demo is what keeps the schedule honest.
Demo and rough-in
Days 1 to 3 are tear-out and haul-away. Then the plumber relocates the drain and supply lines, the electrician runs the GFCI circuits and fan, and we frame any niche or bench. The rough inspection happens before anything gets closed up.
Waterproof and tile
Cement board goes up, then the waterproofing membrane, then a 24-hour flood test on the pan. Tile setting runs 3 to 5 days depending on layout and mosaic work. Grout cures 24 hours before fixtures go back in.
Finish and final inspection
Vanity, toilet, shower glass, trim, paint, and caulk. We test every valve and drain, run the fan, and walk the room with you. The city inspector signs off, and you get a 1-year workmanship warranty in writing.
Tools & methods
Tools and Methods We Use
Purpose-built equipment, used by trained technicians, so the job is done accurately the first time.
Laser level
Sets tile lines, niche heights, and vanity level. A laser level is why the grout lines in your shower are parallel to the ceiling, not drifting a half inch over eight feet.
Tile cutter and wet saw
Porcelain and ceramic need a wet saw for clean cuts, especially on mosaic and large-format tile. A score-and-snap tool chips edges and shows on the finished wall.
Reciprocating saw
Demo work: cutting out old tubs, studs, and drain lines without damaging the framing you're keeping. Controlled cuts mean less patching later.
Milwaukee and DeWalt cordless tools
Drills, impact drivers, and oscillating tools for framing, blocking, and fixture install. We run Milwaukee and DeWalt because they hold up to daily job-site use.
Drywall lift
Holds ceiling drywall in place while it's fastened, which matters in bathrooms where the ceiling is often the hardest panel to set solo. Cleaner seams, fewer cracks.
Air compressor and nail gun
Trim, baseboard, and casing install. A nail gun sets trim consistently and fills faster than hand-nailing, which keeps the finish schedule on track.
Use cases
When Irvine Homeowners Call Us
These examples show how the service framework adapts rather than forcing every call through one repair.

Great Park Primary Suite Curbless Conversion
A 2019 builder-grade primary bath with a moldy shower bench, a 30-inch doorway, and no blocking for future grab bars. The homeowner's mother was moving in and the step-over curb was already a concern. → Re-waterproofed the entire wet area, moved the drain for a curbless slope, widened the doorway to 36 inches, framed blocking for grab bars, installed a comfort-height toilet and a linear drain. Six weeks, ADA-compliant, permit signed off.
Turtle Rock Emergency Repipe and Remodel
A supply line burst behind the vanity in a 1979 Turtle Rock home, soaking the drywall and subfloor. The homeowner needed the water stopped and the bathroom rebuilt before family arrived for the holidays. → Same-day water stop and drying, then a scheduled rebuild with PEX repipe of the bathroom, new drywall, vanity, tile floor, and paint. Four weeks start to finish, documented scope for the insurance adjuster, final inspection passed.
Problems we solve
Bathroom Problems We Fix Before They Spread
Most bathroom calls start with something the homeowner can see. The expensive part is usually what they can't. Here are the four we run into most in Irvine.
Shower pan leaking into the ceiling below
We tear out the pan, inspect the subfloor and joists, replace any rot, and rebuild with a bonded waterproofing membrane and a 24-hour flood test before tile. You get photos of the test and a dry ceiling.
Mold behind the tile and in the wall cavity
We remove the affected drywall and insulation, treat the framing, find and fix the moisture source (usually a failed valve or missing vapor barrier), and rebuild with mold-resistant materials and proper ventilation.
Galvanized or polybutylene supply lines
During demo we pressure-test the supply lines. If they're galvanized or poly, we price a PEX repipe of the bathroom before the walls close. It's cheaper now than after the tile is up.
Permitting delays and unpermitted prior work
We pull the permit before demo, meet the inspector at rough and final, and if we find unpermitted prior work we scope the correction and price it upfront. You get a clean permit history when we're done.
Pricing process
Bathroom Remodel Pricing in Irvine
$6,000 - $65,000 depending on scope
Tile selection
Porcelain and ceramic are the budget-friendly choices. Natural stone, large-format tile, and mosaic patterns add labor and material cost. A herringbone layout can add 20 to 30 percent to tile labor alone.
Plumbing relocation
Keeping the drain and supply lines where they are saves money. Moving the toilet or shower drain means cutting slab or subfloor, which adds cost and permit scope. We'll tell you at the walkthrough which moves are cheap and which aren't.
Subfloor and framing condition
If the subfloor is sound, the budget holds. If there's rot or a failed pan has damaged the joists, that's a repair priced before we do it. Older Irvine homes are more likely to need this.
Who are the best Bathroom Remodel Contractors Near Me in Irvine CA?
The best ones are licensed, insured, pull permits, and can show you a flood-tested shower pan. Ask for the CSLB license number and verify it, ask who actually sets the tile (employees or day labor), and ask for a written scope with line items. We'll hand you all three before you sign anything.
How much do Bathroom Remodel Contractors Near Me charge in Irvine CA?
Typical 2026 pricing in Irvine runs $18,000 to $28,000 for a hall bath gut remodel and $35,000 to $65,000 for a primary suite with layout changes. Cosmetic refreshes (vanity, fixtures, paint, no tile removal) land $6,000 to $12,000. Tile selection, plumbing relocation, and whether the subfloor is sound move the number most.
Is there a 24/7 Bathroom Remodel Contractor Near Me in Irvine California?
For active water damage, yes. If a supply line burst or a shower pan is leaking into the ceiling below, call (949) 236-6306 and we'll get someone out to stop the water and assess. Scheduled remodeling runs normal business hours, but emergency mitigation doesn't wait for Monday.
How long does a bathroom remodel take in Irvine?
A standard hall bath runs 3 to 5 weeks on site. A primary suite with a layout change, moved drain, and custom tile runs 6 to 8 weeks. Permit review with the city adds 1 to 3 weeks before demo starts. We give you a week-by-week schedule at signing, not a vague 'about a month.'
Ready when you are
Get a Bathroom Remodel Contractors Near Me Irvine CA Estimate
Call (949) 236-6306 and we'll walk your bathroom, measure it, and give you a written line-item estimate within 48 hours. Licensed, insured, CSLB General B, and we pull the permit. No charge for the estimate, no pressure to sign.

Talk with the local team
Request Bathroom Remodel Contractors Near Me
Call (949) 236-6306 or email [email protected] to schedule your free estimate. We answer the phone Monday through Friday from 8:00 AM to 6:00 PM, and we return after-hours messages first thing the next morning. For emergencies, call any time and we will get back to you as soon as possible.

